Hiring guide
Hiring a flooring contractor
New floors change how a room looks and feels. Here is what changes the price of flooring work and what to ask before you pick someone.
Updated 2026-11-16
What affects the price
- The floor you choose: vinyl plank, laminate, engineered wood, solid hardwood, tile or carpet.
- The size of the rooms, and how many cuts the layout needs around cabinets, closets and doorways.
- Taking out the old floor and taking it away.
- The condition of the subfloor: low spots, squeaks or water damage need fixing first.
- Stairs, landings and transitions between rooms.
- Moving furniture and taking off and putting back baseboards and trim.
Questions to ask before you hire
- Does the price include removing the old floor and taking it away?
- Who checks the subfloor, and what happens if it needs work?
- Which underlayment will you use, and why?
- How long should the new floor sit in the house before it goes down?
- Is baseboard and trim work part of the quote?
- How do you protect the rest of the house while you work?
How quotes work
Most pros want to see the rooms or get clear photos and rough sizes before they give a firm price. A price over the phone is usually only a range.
A written quote lists the work, the materials, who removes the old material and the waste, and when payments are due. If two quotes list different work, ask each pro to price the same thing so you can compare them fairly.
Some floors need time to settle in the house before they are installed. Ask whether that waiting time is part of the plan.
Typical timeline
- Getting quotes often takes a few days to a week.
- Ordering the floor can take from a few days to a few weeks, depending on the product.
- Putting down a floor in one or two rooms often takes a day or two.
- Fixing a subfloor or doing stairs adds time.
Questions
Can a new floor go over the old one?
Sometimes. It depends on the old floor, the new one and the height at doors and cabinets. Ask the pro to look before you decide.
Do I need to move my furniture?
Ask when you get the quote. Some pros move furniture as part of the job and some expect the rooms to be empty.
How do I compare two flooring quotes?
Check that both list the same floor, the same rooms, removal of the old floor, the underlayment and the trim work.