Free epoxy floor quote calculator for contractors
Price an epoxy floor job in seconds: enter the floor area, your material and labor cost per square foot and your markup. Free, nothing to sign up for.
Use feet or meters (sq ft or m²), the same in every box.
Quote total, before tax
Your own rates, your own currency.
Want the real quote, done for you?
This is a rough number. Vorkeon builds the full epoxy floor quote from one sentence:
- Materials with waste, and crew time from your own pace
- Current prices from building-supply stores near the job
- A clean PDF with your logo that the customer signs on their phone
- Then the invoice, reminders and your crew's hours, in one app
What drives the price of an epoxy floor job
- Concrete prep. Grinding or shot blasting is needed for epoxy to stick; this is a big part of labor.
- Cracks and repairs. Filling cracks, pits and joints before coating.
- Moisture. Damp slabs can make epoxy peel, so testing matters.
- System type. Single coat, flake broadcast, or full metallic finish.
- Number of coats. Primer, base, flake and top coat each add material and time.
- Cure time. The space is out of use for days.
A worked example
A made-up example, not a price guide. A 500 sq ft garage floor with a flake system at 2.50 material and 3.00 labor per sq ft: 500 × 5.50 = 2,750. Add 300 for crack repair, for 3,050. With 25% markup the quote is 3,812.50 before sales tax. Coating prices vary by product and region.
What to put in your epoxy floor quote
- Floor area and the coating system
- Surface prep method (grinding or shot blasting)
- Crack and joint repair
- Moisture testing and what happens if it fails
- Flake color, top coat type and number of coats
- Cure time before walking and before parking a car
Prices vary by region and change over time: use your own supplier prices and labor rates. Updated October 30, 2026.
Epoxy floor quoting questions
Why does epoxy floor coating peel?
The most common causes are poor surface prep and moisture coming up through the slab. Grinding the concrete and testing for moisture before coating help avoid it.
How long before a car can park on a new epoxy floor?
It depends on the product and temperature, but many systems need several days before vehicles. Check the product sheet and put the time in your quote.
How do I price an epoxy floor job?
Multiply the floor area by your material and labor cost per square foot, then add your markup to cover overhead and profit. Add tax on top when you send the quote.
What markup should I use?
Use the markup that covers your overhead (vehicle, insurance, tools, office) and leaves the profit you want. Many contractors land between 15% and 35%, but your own costs decide it.
Is anything saved or sent?
No. The maths runs in your browser. Nothing you type leaves your phone or computer.