VorkeonStart free

Estimate templates

Tile floor estimate template

A tile floor estimate depends on what is under the tile as much as on the tile itself: removal, a stiff and flat base, then tile, thinset, grout and edges. This template gives the lines and units for a porcelain floor and no prices.

Updated November 18, 2026

Template jobTile floorExample

“Tile a 120 sq ft kitchen floor with 12x24 porcelain, remove the old vinyl”

Change the sizes to your job. The line items below stay the same.

What goes in a tile floor estimate

Measure the floor, then take off nothing for cabinets unless you are sure the tile stops at them.

Line itemQuantityUnit
Remove and dispose of the old floorfloor areahours
Subfloor repair or extra screwsas foundhours
Backer board or uncoupling membranefloor areasheets or rolls
Self-levelling compound, if neededlow areasbags
Porcelain tilefloor area plus 10 to 15% wasteboxes
Thinset mortarby floor area and tile sizebags
Grout and sealerby floor area and joint widthbags
Levelling clips for large tilesby number of tilespacks
Edge trim and doorway transitionscount doorways and open edgespieces
Baseboard off and on, or newroom perimeterpieces
Labor to set, grout and sealby floor area and tile sizehours

What to check before you send it

Open it as a real quote

Press the button to load this kitchen floor in Vorkeon. Change the area and tile size to yours, and it builds the board, tile, thinset and grout lines into a priced quote.

No sign-up. No card. The prices it shows are example rates until you add your own.

Questions

How much tile waste should an estimate include?

About 10% for a straight layout with medium tiles. Use 15% for large tiles, diagonal layouts or rooms with many corners, and keep a few spare tiles for the customer.

Do I need backer board or a membrane under floor tile?

Over a wood subfloor, yes: tile needs a stable layer that does not move with the wood. Follow the tile and thinset makers on which one.

Why is labor higher for large tiles?

They show every dip in the floor, need two people to handle, and need levelling clips and more thinset. The floor prep takes longer too.

Read next